期刊文献+

龚家浸大桥现浇箱梁段满堂支架施工工艺要点 被引量:2

Main Points of Construction Technology of Full House Support for Cast-in-place Girder Section of Gongjiaji Bridge
下载PDF
导出
摘要 在桥梁工程中,现浇箱梁是十分重要的结构,其采取满堂支架的施工方式不仅符合施工的基本要求,同时也可提升桥梁的稳定性。以龚家浸大桥为例,多角度分析了施工组织设计,并对其现浇箱梁段上部结构采取满堂支架施工工艺,通过荷载计算的方式明确了支架搭设的基本要求,实现对相关施工工艺的分析,从而提高桥梁施工的完善性。 In the bridge engineering,the cast-in-place box girder is a very important structure.The construction method of the full-frame bracket not only meets the basic requirements of the construction,but also improves the stability of the bridge.In view of the way of selecting case analysis in this paper,Gongjia Bing Bridge was taken as the object of this study.The construction organization design was analyzed from various angles,and the full-frame support construction process was adopted for the upper structure of the castin-place box girder section.The basic requirements of the bracket erection are clarified,and the analysis of the relevant construction process is realized,thereby improving the perfection of the bridge construction.
作者 彭勇 Peng Yong
出处 《建筑技术开发》 2019年第11期101-102,共2页 Building Technology Development
关键词 现浇箱梁 满堂支架 施工工艺 cast-in-place box girder full hall support construction process
  • 相关文献

参考文献3

二级参考文献5

共引文献4

同被引文献19

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部