期刊文献+

水景施工技术重难点研究 被引量:3

Research on Key and Difficult Points of Waterscape Construction Technology
下载PDF
导出
摘要 本文以福州长乐区永荣城市广场水景工程为例,深入分析了水景工程施工面临的重点、难点问题,包括管道铺设、混凝土施工、水景滑动层和压缩层处理、试水施工等技术要点,并对施工技术难点问题进行了深入研究,针对性地提出了解决措施,以期提高城市景观水景施工技术水平。 Taking Yongle Square Waterscape Project in Changle of Fuzhou as an example, this paper deeply analyses the key and difficult problems faced by the construction of the waterscape project, including pipeline laying, concrete construction, treatment of the sliding layer and compression layer of the waterscape and water test, and makes a thorough study on the difficult problems of the construction technology, and puts forward corresponding solutions in order to improve the urban waterscape construction technology level.
作者 谢铭鸿 Xie Minghong(Yinghua Ecological Environment Co.,Ltd.,Changle Fujian 350200,China)
出处 《城市建筑》 2019年第11期122-123,共2页 Urbanism and Architecture
关键词 园林 水景 重点 难点 gardens waterscape key points difficulties
  • 相关文献

参考文献5

二级参考文献12

共引文献28

同被引文献13

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部