浅谈输电线路黄河防洪评估中水文工作要点

Talking about the Main Points of Hydrological Work in the Flood Control Evaluation of the Yellow River in Transmission Lines
下载PDF
导出
摘要 本文首先从水文的角度,介绍输电线路黄河防洪评估的三个主要任务,接着以三个主要任务为出发点,针对三个特高压输电线路防洪评估的实例,对比分析防洪评估的成果,最后总结输电线路黄河防洪评估中水文工作要点。 This paper first introduces three main tasks of flood control evaluation of the Yellow River from the perspective of hydrology, and then takes three main tasks as the starting point, compares the results of flood control assessment of three UHV transmission lines, compares and analyzes the results of flood control assessment, and finally summarizes the transmission. Main points of hydrological work in the flood control assessment of the Yellow River.
作者 陈振华 陈莉 徐金阁 CHEN Zhen-hua;CHEN Li;XYU Jin-ge(Hunan Electric Power Design Institute Co.,Ltd., Changsha 410007, China;State Grid Changsha Power Supply Company, Changsha 410007, China)
出处 《电力勘测设计》 2019年第A01期52-54,58,共4页 Electric Power Survey & Design
关键词 输电线路 防洪评估 transmission lines flood control assessment
  • 相关文献

参考文献3

二级参考文献8

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部