某贮灰场光伏电站防洪工程设计洪水分析 被引量:1

Analysis of Risk Management of Flood Control Project in a Photovoltaic Power Plant
下载PDF
导出
摘要 电厂贮灰场经过多年运行达到设计能力贮满后,将覆土修复或种草或植树,保护了生态环境。本项目是在其上布设光伏电站,产生绿色能源。光伏电站的安全是建立在灰场之上,故应先了解其灰场的设计标准,运行多年后应重新复核其设计洪水,判断防洪设施的防护能力,确保光伏电站的安全。 After years of operation, the power plant ash yard will reach the design capacity. Once the ash yard is full, the ecological environment will be repaired by covering soil, planting grass or planting trees. In this paper, photovoltaic power plants are installed on the basis of ash field restoration to generate green energy. The safety of photovoltaic power plants is based on the ash yard. Therefore, the design standards of the ash yard should be found out first. To guarantee the safety of the photovoltaic power station, the design flood of the ash yard should be rechecked again after many years of operation, and the protection capability of flood control facilities be re-evaluated.
作者 张树田 赵俊萍 李强 ZHANG Shu-tian;ZHAO Jun-ping;LI Qiang(Shanxi Electric Power Engineering Co., Ltd. of CEEC, Taiyuan 030001, China)
出处 《电力勘测设计》 2019年第A01期88-89,共2页 Electric Power Survey & Design
关键词 伏电站 灰场 洪水 安全 photovoltaic power station ash yard flood safety
  • 相关文献

参考文献1

二级参考文献4

  • 1张继权,冈田宪夫,多多纳裕一.综合自然灾害风险管理——全面整合的模式与中国的战略选择[J].自然灾害学报,2006,15(1):29-37. 被引量:178
  • 2Muller U. Hochwasserrisiko man- agement--Theorie und Praxis [M]. Wiesbaden: Vieweg +Teubner Verlag, 2010.
  • 3EU. Richtlinie 2007/60/EG des Europaischen Parlaments und des Rates vom 23. Oktober 2007 fiber die Bewertung und das Management yon Hochwasserrisiken [J]. Amtsblatt der Europaischen Union,2007,50(L 288).
  • 4Merz B,Bittner R. RIMAX-The- menheft [J]. Hydrologie und Wasser- bewirtschaftung, 2009,53 (3).

共引文献3

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部