摘要
受电力系统规划、地形地质条件、诸多障碍设施及地方政府意见等因素影响,特高压(ultra high voltage,UHV)线路相互之间的交叉跨越越来越常见,重冰区交叉跨越难以避免。本文结合工程实例,分析论述重冰区特高压架空输电线路交叉跨越时的抗冰措施。
Under the influence of power system planning, topographic and geological conditions, many obstacles and facilities, and opinions of local governments, the crossing of UHV transmission lines is becoming more and more common, and it is difficult to avoid the crossing of heavy icing areas. Combined with engineering examples, this paper analyzes and discusses the anti-ice measures of UHV overhead transmission lines crossing in heavy icing area.
作者
李关强
杨晓瑞
LI Guan-qiang;YANG Xiao-rui(Sichuan Electric Power Design&Consulting Co.,Ltd., Chengdu 610041, China)
出处
《电力勘测设计》
2019年第A01期221-224,共4页
Electric Power Survey & Design
关键词
重冰区
特高压
架空输电线路
交叉跨越
抗冰措施
heavy icing area
UHV
overhead transmission lines
crossing