摘要 针对岳城煤矿排矸斜巷下山掘进顶板支护难度大,爆破质量不高,生产组织不当等问题,提出了采用多钻机同时作业、结合基于现场统计分析的爆破质量改进和二倍标准差法的劳动组织优化方案。巷道的月进尺由37m增加到64m,杜绝了欠挖现象,巷道爆破成型达标率达到94.17%。 Aiming at the problems such as roof supporting difficulty, low blasting quality and improper production organization, etc. in dip head-driving of inclined tunnel, Yuecheng Colliery, the paper proposed a labor organization optimization scheme combined with simultaneous blasting quality improvement and double standard deviation method based on on-site big data statistical analysis, which greatly improved the tunneling speed and effectively solved the problem of tight connection between mine production.
作者 解超超 Xie Chaochao(Jincheng Hongsheng Architectural Engineering Co., Ltd., Jincheng Shanxi 048100)
出处 《江西煤炭科技》 2019年第3期175-176,179,共3页 Jiangxi Coal Science & Technology
关键词 岩巷掘进 高阻让压 边掘边喷 二倍标准差 rock drivage high resistance yield pressure driving and spraying double standard deviation
  • 相关文献

参考文献4

二级参考文献11

共引文献266

同被引文献3

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部