南水北调中线干线工程建设管理与实践 被引量:5

Construction management and practice of South-to-North Water Diversion Middle Route Project
下载PDF
导出
摘要 南水北调中线干线工程自2003年开工建设至全线建成正式通水历时11年,工程线路长、地质条件多样、工程技术复杂、参建单位众多。建设过程中,在合同、技术、质量、进度管理等方面做出了大量创新探索,并取得了较好效果,对其他同类型水利工程的建设具有一定的参考价值和实践意义。 The South-to-North Water Diversion Middle Route Project started construction in 2003 and finally formally water delivery to the whole line, which lasted 11 years. The project has a long line, diverse geology, complex technology and a large number of participating units. In the course of construction, a lot of innovations and explorations have been made in contract, technology, quality and schedule management, which can provide reference for other same-scale water conservancy projects.
作者 李舜才 倪升 王伟 Li Shuncai;Ni Sheng;Wang Wei
出处 《中国水利》 2019年第14期29-32,36,共5页 China Water Resources
关键词 南水北调中线干线工程 建设管理体系 工程建设管理 建设管理成效 South-to-North Water Diversion Middle Route Project construction management system constructionmanagement effectiveness of construction management
  • 相关文献

参考文献1

共引文献46

同被引文献17

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部