摘要 FIDIC(国际咨询工程师联合会)合同是国际土木工程界的标准合同和执行依据。结合非洲某污水处理厂工程项目的实际情况,就其合理利用FIDIC合同条款、确定索赔的方向和目的作出阐述,并重点解析了变更索赔的基本内容、原则、程序及注意事项。索赔工作取得了理想的效果,其成功经验亦可为类似工程提供参考。 FIDIC(International Federation of Consulting Engineers)contract is the standard contract and implementation basis of the international civil engineering community.In view of the actual situation of a wastewater treatment plant project in Africa,the rational use of FIDIC contract terms and the determination of the direction and purpose of claims are expounded,and the basic contents,principles,procedures and attentions of the change claims are focused on.The claim work achieves ideal results,and its successful experience can also provide reference for similar projects.
作者 刘建 LIU Jian(China Civil Engineering Construction Corporation,Beijing 100038,China)
出处 《建筑施工》 2019年第7期1395-1396,共2页 Building Construction
关键词 FIDIC 合同变更 费用索赔 建筑经济 FIDIC contract change cost claim construction economy
  • 相关文献

参考文献1

共引文献5

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部