摘要
采矿工程分为露天开采和地下开采,简要介绍某地采矿山项目甲乙双方在结算时遇到的问题及最终解决办法。
Mining project is divided into open-pit mining and underground mining.This paper briefly introduces the problems occurred during settlement of a underground mine project between contractor and client and final solutions for the problems.
作者
冯丹
FENG Dan(GRIMM Technology Group,Beijing 100160,China)
出处
《矿业工程》
CAS
2019年第4期1-2,共2页
Mining Engineering
关键词
地下采矿
结算
定额
underground mining
settlement
quota