摘要
在现代社会发展的过程中,电力具有不可或缺的现实意义,是国家经济建设的基础,必须加强重视,确保能够科学保障我国现代化建设,在具体进行10kV配网电力工程建设过程中,出现技术问题会对建设效果造成很大程度的不利影响,影响国家经济建设,必须对其进行有效控制,保障国家电力工程的稳定性和持续发展。文中首先分析了在进行电力工程建设过程中常见的技术问题,然后以此为基础,探究问题解决策略,分别从施工准则、科学规划、污染问题、配网故障范围、配网设备配置5个方面展开具体论述,希望能够为相关工作人员具体作业提供理论依据。
In the process of modern social development,electric power has indispensable practical significance and is the foundation of national economic construction.It must be emphasized and ensured that it can scientifically guarantee China’s modern construction and construction,and carry out the construction process of 10 kV distribution network power engineering.Among them,technical problems will have a great degree of adverse impact on the construction effect,affecting the national economic construction,must be effectively dealt with to ensure the stability and sustainability of the national power engineering.Firstly,it analyzes the common technical problems in the process of power engineering construction,and then based on this,explores the problem-solving strategy,and starts from the five aspects of construction guidelines,scientific planning,pollution problems,distribution network fault range,and distribution network equipment configuration.Discuss,I hope to provide a richer theoretical basis for the specific work of the relevant staff.
作者
朱路遥
汪进建
Zhu Lu-yao;Wang Jin-jian
出处
《电力系统装备》
2019年第12期44-45,共2页
Electric Power System Equipment
关键词
10kV
配网电力工程
技术问题
10 kV
distribution network power engineering
technical problems