摘要
特高压工程是国家近年来大力发展的输电工程,增进了我国电力行业的发展速度。目前,特高压在完全国产化的前提之下,牵涉大量技术创新,没经验可汲取。本文对特高压变电站户外敞开设备安装展开了探究,对于经验总结、技术的规范提升均有实际关键价值。
UHV engineering is a power transmission technology developed by the country in recent years,which has enhanced the rapid development of China’s power industry.At present,UHV is involved in a large number of technological innovations under the premise of complete localization,and no experience can be learned.According to the paper,the installation of outdoor open equipment in UHV substation is explored,which has key practical value for experience summarization and technical specification improvement.
出处
《电力系统装备》
2019年第12期102-103,共2页
Electric Power System Equipment
关键词
特高压变电站
变压器
设备安装
UHV substation
Transformer
Equipment installation