1Chan-Sik Park,Do-Yeop Lee,Oh-Seong Kwon,Xiangyu Wang.A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template[J].Automation in Construction.2013
2Changmin Kim,Hyojoo Son,Changwan Kim.Automated construction progress measurement using a 4D building information model and 3D data[J].Automation in Construction.2013
3Kristen Barlish,Kenneth Sullivan.How to measure the benefits of BIM — A case study approach[J].Automation in Construction.2012
4Javier Irizarry,Ebrahim P. Karan,Farzad Jalaei.Integrating BIM and GIS to improve the visual monitoring of construction supply chain management[J].Automation in Construction.2012
5Atul Porwal,Kasun N. Hewage.Building Information Modeling (BIM) partnering framework for public construction projects[J].Automation in Construction.2012
6Zhenzhong Hu,Jianping Zhang.BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials[J].Automation in Construction.2010(2)
7Darius Migilinskas, Vladimir Popov, Leonas Ustinovichius. The benefits, obstacles and problems of practical BIMimplementation[J].Procedia Engineering, 2013 (57) : 767- 774.