大直径盾构下穿越导堤数值分析 被引量:10

Finite difference analysis of impact of undercrossing super-large-diameter shield tunnel on training jetty
下载PDF
导出
摘要 以上海沿江通道隧道工程为背景,采用有限差分法模拟超大直径盾构隧道开挖对上海吴淞导堤的影响,评价堤身加固在控制导堤变形、沉降差、堤顶地表沉降等方面的效果;分析开挖面土体加固对控制地层损失的有利影响程度、及在泥水盾构隧道中谨慎采用土体加固的原因。结合现场实际施工情况与监测数据,得出穿越过程中盾构主要施工参数确定的原则及控制措施。 Based on the tunnel project of highway passage along Yangtze River in Shanghai, the impat of undercrossing super-large-diameter shield tunnel on training jetty is analyzed by using the finite difference methods. The deformation of jetty structures, settlement difference and ground settlement of jetty top are used to evaluate the improvement effectiveness of jetty structures. The numerical simulation method in cooperation with the construction experience is employed to study the soil reinforcement at the excavation face of shield tunneling, and its advantages and disadvantages are analyzed. Finally, based on the numerical analysis and in-situ monitoring results, the key construction parameters and control measures of the shield tunnel undercrossing the training jetty are obtained.
作者 杨建刚 YANG Jian-gang(Shanghai Tunnel Engineering Construction Co., Ltd., Shanghai 200032,China)
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2019年第8期1569-1572,共4页 Chinese Journal of Geotechnical Engineering
关键词 大直径 下穿越盾构隧道 导堤 数值分析 现场监测 large diameter undercrossing shield tunnel training jetty numerical analysis in-situ monitoring
  • 相关文献

参考文献2

二级参考文献6

共引文献36

同被引文献86

引证文献10

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部