摘要
通过对大焦炉开工首要步骤改正常加热方案的制定研究,确保焦炉开工工作有序进行,为其他焦化厂焦炉开工提供参考依据。
Through the study of the first steps of the large coke oven to change the normal heating scheme,ensure that the coke oven start work is carried out in an orderly manner,which provides a reference for the start of coke ovens in other coking plants.
作者
徐芹
Xu Qin(Baotou Iron and Steel Technical and Further Education College,Baotou 014010,Inner Mongolia,China)
出处
《四川化工》
CAS
2019年第4期32-34,37,共4页
Sichuan Chemical Industry
关键词
大焦炉
开工
正常加热
large coke oven
go into operation
normal heating