莱钢1~#1880 m^3高炉炉凉恢复实践 被引量:1

Practice of Recovery of Blast Furnace Conditions after Unplanned Stopping Coal Injection of No.1 1 880 m^3 BF in Laiwu Steel
下载PDF
导出
摘要 介绍了莱钢型钢炼铁厂1#1880m^3高炉无计划停煤的经过、停煤前的炉况基础、恢复过程及采取的措施,特别是对补煤的数量进行了计算,并对炉况恢复经验进行了归纳总结,提出了高炉炉凉的处理思路。 This paper introduces the process of Unplanned coal shutdown of No. 1 BF, the basis of furnace condition before coal shutdown, the process of recovery and the ways adopted, especially the calculation of the quantity of coal supplement, summarizes the experience of furnace condition recovery and puts forward the treatment ideas of furnace cooling in Laiwu Steel Section Iron and Steel Works.
作者 朱明琦 ZHU Mingqi(The Ironmaking Plant of Yinshan Section Co., Ltd. of Laiwu Steel Group, Laiwu 271104, China)
出处 《山东冶金》 CAS 2019年第4期6-8,共3页 Shandong Metallurgy
关键词 高炉 停煤 炉况 补煤量 blast furnace stopping coal injection furnace cooling furnace condition coal quantity
  • 相关文献

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部