期刊文献+

基于4D-BIM的曲港高速公路质量与安全研究 被引量:13

4D-BIM Based Quality and Safety Management for Qugang Highway
下载PDF
导出
摘要 为增强高速公路施工质量安全管理水平,将4D与BIM(4D-BIM)技术应用于项目施工的实际管理过程中,开发了基于BIM的曲港(河北曲阳至黄骅港)高速公路建设管理系统。在高速公路工程中,进行了施工安全与质量监控及分析,并应用了4D-BIM时变结构安全分析系统。引入物联网、智能传感技术、数字监测等技术,对重点桥梁施工安全进行动态监测,实现基于物联网施工的数字化管理,从而提升公路工程质量安全管理水平。为BIM在高速公路工程质量安全管理中的应用提供了方法和实例,对深化施工阶段BIM应用具有重要价值。 In order to improve the construction quality and safety management level of Qugang highway,this paper utilized 4D-BIM technology in a highway construction project.Construction safety and quality monitoring and analysis were carried out in highway quality and safety management,and a 4D-BIM time-varying structural safety analysis system was applied.This study introduces technologies such as the Internet of things,intelligent sensing technology,and digital monitoring to dynamically monitor the construction safety of key bridges and realize digital management of construction based on the Internet of things,thus improving the quality and safety management level of highway construction.This study provides methods and examples for the application of BIM in the quality and safety management of road construction,and is of great value for deepening the application of BIM in the construction phase.
作者 张超 ZHANG Chao(Hebei Qugang Expressway Development Company,Baoding Hebei 073000,China)
出处 《图学学报》 CSCD 北大核心 2019年第4期778-782,共5页 Journal of Graphics
关键词 BIM 4D-CAD 公路工程 质量管理 安全管理 BIM 4D-CAD road construction quality management safety management
  • 相关文献

参考文献8

二级参考文献59

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2刘新房,郭伟香.桥梁施工管理信息系统设计[J].山东交通科技,2005(4):48-51. 被引量:2
  • 3Kam C, Fischer M, Hanninen R. The product model and fourth dimension project [J]. ITcon, Special Issue IFC- Product Models for the AEC Arena, 2003, 8: 137-- 166.
  • 4Liston K M, Fischer M, Kunz J. 4D annotator: A visual decision support tool for construction planners [C]. Computing in Civil Engineering, Proceedings of International Computing Congress. Boston, ASCE, 1998. 330--341.
  • 5Wang Hongjun, Zhang Jianping, Chau K W. 4D dynamic management for construction planning and resource utilization [J]. Automation in Construction, 2004, 13(5): 575 --589.
  • 6Yu K, Froese T, Grobler F. A development framework for data models for computer-integrated facilities management [J]. Automation in Construction, 2000, 9: 145--167.
  • 7Moil Y, Ellingwood B R. Reliability-based service-life assessment of aging concrete structures [J]. Journal of Structural Engineering, 1993, 119(5): 1600--1621.
  • 8Zhou Chenghan, Wang Weidong. Highway Bridge Construction Process Simulation Based on 4D Visualization[C]//Geo Hunan2009 International Conference, 2009, Changsha, 138-- 145.
  • 9张洋,张建平,等.国家体育场工程4D施工管理系统[C]//第八届全国建设领域信息化和多媒体辅助工程学术交流,2005.
  • 10Fangqin Tang, Aizhu Ren. GIS-based 3D evacuation simulation for indor fire [ J ]. Building and Environment, 2012 ( 49 ) : 193 -202.

共引文献145

同被引文献133

引证文献13

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部