摘要 设计作为支护结构的圆形地下连续墙需要对基坑开挖过程中的墙体水平位移作出有效的估算。文章为探究影响墙体水平位移的控制性参数,结合平南三桥北岸拱座基础的圆形地下连续墙工程背景,采用考虑环向效应及施工过程的弹性地基梁法,建立结构有限元模型,以结构几何条件作为分析参数进行敏感性分析。结果表明:地下连续墙墙厚和外径是影响墙身水平位移的主要因素。研究结果可为圆形地下连续墙设计、优化提供参考。 Designing a circular diaphragm wall as the supporting structure requires an effective estimation for the horizontal displacement of the wall during excavation.In order to explore the control parameters affecting the horizontal displacement of the wall,combined with the circular diaphragm wall at the north-bank abutment foundation of Pingnan Third Bridge,this article establishes the structural finite element model by using the elastic foundation beam method considering the hoop effect and the construction process,and performs the sensitivity analysis with the structural geometry as the analytical parameter.The results show that the thickness and outer diameter of diaphragm wall are the main factors affecting the horizontal displacement of the wall.The research results can provide the reference for the design and optimization of circular diaphragm wall.
作者 罗富元 欧阳平 张晓宇 LUO Fu-yuan;OUYANG Ping;ZHANG Xiao-yu(Guangxi Communications Design Group Co.,Ltd.,Nanning,Guangxi,530029)
出处 《西部交通科技》 2019年第4期1-3,193,共4页 Western China Communications Science & Technology
关键词 圆形地下连续墙 水平位移 弹性地基梁法 敏感性分析 Circular diaphragm wall Horizontal displacement Elastic foundation beam method Sensitivity analysis
  • 相关文献

参考文献2

二级参考文献17

  • 1汪贵平,李华梅,费永成,赵洪琼.格形地下墙结构在基坑工程中的应用[J].地下空间与工程学报,2005,1(4):584-586. 被引量:26
  • 2张德富,童立元,刘松玉,高新南,娄成斌.苏州地铁1号线车站深基坑围护结构变形性状分析[J].地下空间与工程学报,2013,9(S2):1961-1965. 被引量:31
  • 3龚晓南.关于基坑工程的几点思考[J].土木工程学报,2005,38(9):99-102. 被引量:204
  • 4Gifford Douglas G, Wheeler James R. Concrete slurry wall for temporary and permanent foundation wall at gallery at harbor place- Baltimore[ Z]. Maryland: ASTM Special Technical Pub- lication, 1992, 1129 : 151 - 163.
  • 5Peng F.-L.,Wang H.-L.,Tan Y.,Xu Z.-L.,Li Y.-L.Field measurements and finite-element method simulation of a tunnel shaft constructed by pneumatic caisson method in Shanghai soft ground. Journal of Geotechnical and Geoenvironmental Engineering . 2011
  • 6Yong Tan,Mingwen Li.Measured performance of a 26 m deep top-down excavation in downtown Shanghai. Canadian Geotechnical Journal . 2011
  • 7Tan Y.,Wei B.Performance of an overexcavated metro station and facilities nearby. Journal of Performance of Constructed Facilities . 2012
  • 8Shaoming Liao,Yaoyao Fan,Zhenhao Shi,Wei Shao,Xiangpeng Kong.??Optimization study on the reconstruction and expansion of an underground rail transit center in Shanghai soft ground(J)Tunnelling and Underground Space Technology incorporating Trenchless Technology Research . 2013
  • 9Wang, J.H.,Xu, Z.H.,Wang, W.D.Wall and ground movements due to deep excavations in Shanghai soft soils. Journal of Geotechnical and Geoenvironmental Engineering . 2010
  • 10聂宗泉,张尚根,孟少平.软土深基坑开挖地表沉降评估方法研究[J].岩土工程学报,2008,30(8):1218-1223. 被引量:65