大型预制柱灌浆套筒连接施工技术 被引量:2

Construction Technology of Large Precast Column Grouting Sleeve Connection
下载PDF
导出
摘要 大型预制柱竖向钢筋采用灌浆套筒连接技术,联通仓灌浆时因截面尺寸较大、灌浆通道较长,易产生灌浆不通畅的风险,影响装配式建筑工程质量。针对大型预制柱,研究并提出了预埋灌浆套筒及灌浆通道的合理高效生产工法、现场高效安装及灌浆工法、灌浆过程中爆仓及个别套筒不出浆时简易处理方法,有效保证了其生产及施工质量。 The vertical steel bars of large prefabricated columns adopt the grouting sleeve connection technology. Due to the large cross-section size and long grouting passage, the risk of grouting is not smooth, which affects the quality of the prefabricated building engineering. For large-scale prefabricated columns, the reasonable and efficient production method of pre-buried grouting sleeve and grouting channel, the efficient installation and grouting method on site, the bursting in the grouting process and the simple treatment method when the individual sleeves are not discharged are effectively studied. Its production and construction quality.
作者 马祥飞 吴勇 蒋小东 MA Xiang-fei;WU Yong;JIANG Xiao-dong(China Construction New Building Components (Guang Dong) Co., Ltd., Dongguan, Guangdong 523000)
出处 《新型工业化》 2019年第7期111-116,共6页 The Journal of New Industrialization
关键词 预制柱 灌浆套筒 现场安装 灌浆 Prefabricated column Grouting sleeve On-site installation Grouting
  • 相关文献

参考文献9

二级参考文献43

共引文献62

同被引文献17

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部