摘要
本文以锦州港某码头改造工程为背景,根据工程的结构特点及改造条件,分析出改造工程复核计算中,冰荷载为主要控制工况。本文着重对工作平台的冰荷载工况进行有限元整体建模计算。在采用不同参数进行冰荷载计算后,对不同工况的计算结果进行充分对比分析,并提出有效地破冰措施,为类似工程提供参考依据。
Based on the structural characteristics and renovation conditions of a terminal in Jinzhou port, ice load is determined as main control working condition in the project re-computation.A finite element model is built to calculate the ice load working condition of the platform.The calculation results of ice load based on different working conditions and parameters are fully compared and analyzed.And effective ice-breaking measures are proposed for similar projects.
作者
吴丹
冯璐
Wu Dan;Feng Lu(Water Transport Engineering Quality and Safety Supervision Department,Liaoning 121007,China;CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China)
出处
《港工技术》
2019年第4期68-70,共3页
Port Engineering Technology
关键词
冰荷载
桩基承台
破冰锥
ice load
pile-supported platform
ice awl