期刊文献+

核电首堆工程进度管理方法和流程探讨 被引量:3

Discussion on the Schedule Management Method and Process of the First Reactor Project of Nuclear Power
下载PDF
导出
摘要 由于核电“首堆”项目的固有特性,其推进过程不确定性比成熟堆更高,给传统的成熟进度管理方法带来挑战,需要创新进度管理方法。本文结合台山一期“首堆”工程实践,探讨提炼了一套以“前瞻性分析、分阶段实施和动态管控”为特色的首堆工程进度管理方法和流程。 Due to the inherent characteristics of the "first reactor" project of nuclear power,the uncertainty of the propulsion process is higher than that of the mature reactor,which brings challenges to the traditional mature schedule management method and requires innovative schedule management method.This paper combines the "first reactor" engineering practice of Taishan Phase I to explore and refine a set of first reactor project schedule management methods and processes featuring "forward-looking analysis,phased implementation and dynamic management and control".
作者 朱爱国 ZHU Ai-guo(Taishan Nuclear Power Joint Venture Co.,Ltd.,Jiangmen 529228,China)
出处 《价值工程》 2019年第25期44-47,共4页 Value Engineering
关键词 首堆 进度管理 前瞻性分析 分阶段实施 动态管控 first reactor schedule management forward-looking analysis phased implementation dynamic control
  • 相关文献

参考文献3

二级参考文献11

共引文献7

同被引文献10

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部