摘要
针对传统密闭墙构筑工艺周期长、劳动强度大、密闭效果差等问题,提出了浇筑式构筑密闭墙新工艺,阐述了施工过程及墙体受力情况,该技术应用于现场,现场监测效果良好。
Aiming at the problems of long process period, labor intensity and poor sealing effect of traditional closed wall construction, a new technology of pouring and constructing closed wall is proposed.The construction process and wall stress are expounded. The technology is applied to the site .And the field monitoring effect is good.
作者
王利军
WANG lijun(Qiyi Coal Industry Corporation Ltd., Shanxi coal tmnsportation and Sales Group , Gaoping 048400,China)
出处
《煤矿现代化》
2019年第6期21-22,共2页
Coal Mine Modernization
关键词
传统密闭墙
浇筑式
现场应用
traditional closed wall
pouring type
field application