期刊文献+

市政工程邻近既有地铁区间变形控制分析

Deformation Control Analysis of the Section of Municipal Engineering Close to Existing Subway
下载PDF
导出
摘要 基于红军营城铁桥桥区积水治理工程邻近地铁13号线立水桥站-北苑站区间工程,对新建暗挖调蓄池隧道以及管线邻近地铁区间路基结构变形控制进行了分析。通过Midas/GTS对施工过程进行数值模拟,分析并评价邻近施工对路基结构的影响,并采取相应的轨道防护措施,保证施工对地铁运营的安全。 Based on the water treatment project of bridge area of Hongjunying Chengtie bridge near by the section of Lishuiqiao station to Beiyuan station of Metro Line 13, this paper analyzes the deformation control of subgrade structure of the adjacent subway and the newly built underground storage tank tunnel. Through Midas/GTS, the construction process is numerically simulated, and the influence of adjacent construction on the subgrade structure is analyzed and evaluated. Corresponding rail protection measures are taken to ensure the safety of the construction of the subway.
作者 潘婷 PAN Ting(Beijing Urban Construction Design & Development Group Co. Limited, Beijing 100037, China)
出处 《工程建设与设计》 2019年第16期67-69,共3页 Construction & Design for Engineering
关键词 市政隧道 市政管线 邻近地铁 变形控制思路 变形分析 municipal tunnel municipal pipeline adjacent subway deformation control ideas deformation analysis
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部