结合新八达岭隧道下穿既有京张铁路青龙桥车站站场段工程,分析新建隧道下穿既有铁路车站加固技术,为相关工程提供参考。
Combing with the project of New Badaling tunnel under-crossing the existing Beijing to Zhangjiagkou railway Qinglong station segment, paper analysis the reinforcement technology for new tunnel under-crossing existing railway station, to provide reference to related engineering.
作者
单红雨
SHAN Hong-yu(Beijing Ruiwei Railway Technology Engineering Co. Ltd., Beijing 100055, China)
出处
《工程建设与设计》
2019年第16期113-114,共2页
Construction & Design for Engineering
关键词
隧道
下穿
铁路车站
tunnel
under-crossing
railway station