如何提高初步设计概算质量与有效控制工程造价 被引量:3

How to Improve the Quality of Budget Estimate of Preliminary Design and Effectively Control the Engineering Cost
下载PDF
导出
摘要 初步设计概算是初步设计文件中不可或缺的一个重要环节,对项目实施全过程的投资选择和投资控制有重要的作用,因此,必须严肃对待初步设计概算的编制工作和审核工作,使项目规划、工程设计和施工方案都达到最优水准,从而缩短施工周期、降低施工难度、压缩工程成本。基于此,论文对各工程费用的编制要点进行了详细的分析,以供参考。 The budget estimate of preliminary design is an indispensable and important link in the preliminary design, which plays a basic role in the investment choice and investment control in the whole process of project implementation. Therefore, the compilation and review of preliminary design estimates must be taken seriously so as to make the project planning, engineering design and construction plan reach the optimal level, thus shortening the construction period, reducing the construction difficulty and reducing the project cost. Based on this,this paper has carried on the detailed analysis to each project expense compilation key point, for the reference.
作者 王炜华 WANG Wei-hua(China Railway Shanghai Design Institute Group Co. Ltd., Shanghai 330026, China)
出处 《工程建设与设计》 2019年第16期217-218,共2页 Construction & Design for Engineering
关键词 初步设计概算 质量 工程造价 budget estimate of preliminary design quality engineering cost
  • 相关文献

参考文献1

同被引文献9

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部