期刊文献+

基于BIM技术的装配式结构施工过程研究 被引量:2

Research on Construction Process of Assembly Structure Based on BIM Technology
下载PDF
导出
摘要 针对装配式结构在施工过程所面临的问题,利用BIM的三维建模技术,从装配式结构构件生产、场地布置、质量管控、安全管理、进度安排等几个方面入手,解决装配式结构在施工过程中所面临的问题,为装配式结构的施工过程提供一种新的思路。 In view of the problems faced by the assembly structure in the construction process, the threedimensional modeling technology of BIM is uesed, this paper solves the problems faced by the assembly structure in the construction process from the aspects of assembly structural component production, site layout, quality control, safety management, schedule arrangement and so on, and provides a new idea for the construction process of the assembly structure.
作者 李科 LI Ke(Nanyang Normal University, Nanyang 473003, China)
出处 《四川职业技术学院学报》 2019年第4期162-164,共3页 Journal of Sichuan Vocational and Technical College
基金 南阳师范学院校级研究项目(2018QN013) 南阳师范学院校级教学研究项目(2018-JXYJYB-37) 河南省高等学校重点科研项目(16B560006)
关键词 装配式 BIM 施工过程 assembly type BIM construction process
  • 相关文献

参考文献5

二级参考文献25

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:109
  • 2任江,王啸波,郭娜.BIM在建筑工程生命周期的理论研究[C]//第三届工程建设计算机应用创新论坛论文集.2011.
  • 3Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 4Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 5Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 6Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 7Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 8Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 9Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.
  • 10蒋勤俭.住宅建筑工业化关键技术研究[J].混凝土世界,2010(3):34-36. 被引量:11

共引文献951

同被引文献12

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部