摘要
分析总结长平矿大采高工作面的设备回收及安装控制技术应用工作。以长平矿大采高工作面的设备类型介绍为切入点,对长平矿大采高工作面的设备回收工作进行分析,并对大采高工作面的设备安装控制技术的应用工作进行阐述,总结出了在整个设备回收工作当中的设备类型的正确选择,各个操作环节的人员分配及设备的使用,以及设备的安装工作当中安全技术控制要点。以此来保证整个工作面设备回收安装工作的安全顺利开展。
the application of equipment recycling and installation control technology for the large mining face of Changping Mine were analyzed andsummarized. Taking the introduction of the type of equipment in the large mining face of Changping Mine as the entry point, the equipment recoverywork of the large mining height working face of Changping Mine was analyzed, and the application of equipment installation control technology for thelarge mining height working face was applied. Explain, summed up the correct choice of equipment types in the entire equipment recycling work, thepersonnel allocation of each operation link and the use of equipment, as well as the safety technical control points in the installation work of theequipment. In this way, the safety and smooth operation of the entire work surface equipment recycling installation work is guaranteed.
作者
梁建兵
LIANG Jian-bing(Jincheng Coal Industry Group Changping Company, Jincheng 048000,China)
出处
《机电工程技术》
2019年第8期291-292,共2页
Mechanical & Electrical Engineering Technology
关键词
大采高工作面
设备回收
设备安装
控制技术
large mining height working face
equipment recycling
equipment installation
control technology