摘要
文中主要针对井下采取离层注浆充填开采技术条件下,对地表变形及建(构)筑物安全监测技术方案进行探讨,达到合理布设观测站,科学收集监测数据,为注浆充填阶段控制、工艺调整及效果评价提供可靠依据。
In this paper, mainly aiming at the condition of underground mining with separated layer grouting and filling technology, on the technical schemes of the surface deformation and building safety monitoring were discussed, the observation stations were carried out reasonably the layout and the detection data was collected scientifically providing the reliable basis for the control of filling stage, the process adjustment and the effect evaluation of grouting.
作者
魏祥平
Wei Xiangping(Huaibei Mining group, Huaibei 235000, China)
出处
《矿山测量》
2019年第4期21-23,共3页
Mine Surveying
关键词
注浆充填
地表变形监测
安全监测
grouting filling
surface deformation monitoring
safety monitoring