摘要
文中以山东某矿为例,介绍了动态预复垦技术在复垦工程设计中的应用。基于开采沉陷预计确定了沉陷区最佳动工时间和施工工艺,改善了施工条件,缩短了复垦工程周期,提高了复垦的经济和社会效益。
Taking a mine in Shandong as an example, in the paper, the application of the dynamic pre-reclamation technology was introduced in the design of reclamation engineering. Based on the prediction of mining subsidence, the optimal construction time and the construction technology were determined in the subsidence area, the construction conditions were improved, the reclamation engineering cycle was shortened, and the economic and social benefits of reclamation were improved.