4Barrack C S, Siew W H, Pryor B M. Techniques for the measurement of fast transient electromagnetic interference within power system substations. Proceedings of the 1996 31st Universities Power Engineering Conference. Part 3 (of 3), Sep 18-20 1996, Iraklio, Greece.748-751.
5Wiggins C.M, Wright S.E.Switching transient fields in substation[J].IEEE.TRAN.On power delivery. VOL 6. No.2. April 1991.591-600.
6DL/z713-2000.500kV变电所保护设备和控制设备抗扰度要求[S].[S].,..
7Riechert U, Holaus W, Krusi U, et al. Design and test of gas-insulated circuit-breaker and disconnector for 1 100 kV[C]//Proceedings of 2009 International Conference on UHV Power Transmission. Beijing, China: SGCC, 2009: 1-6.
8Rashidi F. Formulation of the field-to-transmission line coupling equations in terms of magnetic excitation field [J]. IEEE Transactions on Electromagnetic Compatibility, 1993, 35(3): 404-407.
9Paul C R, Feather A E. Computation of the transmission line inductance and capacitance matricesfrom the generalized capacitance matrix[J]. IEEE Transactions on Electromagnetic Compatibility, 1976, 18(4): 175-183.
10Paul C R. Analysis of multiconductor transmission lines[M]. New York: John Wiley, 1994: 64-246.