期刊文献+

地质灾害治理工程后评价方法 被引量:3

Post Evaluation Method for Geological Disaster Control Engineering
下载PDF
导出
摘要 建立了地质灾害治理工程勘查、设计、施工、监理和建设单位各参与方的后评价标准,分别对各参与方进行评价后,根据各参与方重要性进行权重赋值,最终确定综合得分及评价等级。该后评价方法对所有参与单位均有约束力,有利于提高地质灾害治理工程质量管理。该后评价方法操作性强,评价结果与实际相符,可为政府及决策管理部门进行地质灾害勘查、设计、施工及监理等管理提供参考。 This paper establishes the post-evaluation criteria of each participant in geological hazard control project exploration,design,construction,supervision and construction units.After evaluating each participant,the weights are assigned according to the importance of each participant,and the comprehensive score and evaluation grade are finally determined.The post-evaluation method is binding on all participating units.It is beneficial to improve the quality management of geological disaster control projects.The post-evaluation method has strong operability and the evaluation results are consistent with the actual situation.It can provide reference for the government and decision-making management departments in geological hazard exploration,design,construction and supervision.
作者 林华国 卿展辉 LIN Huaguo;QING Zhanhui(Guangdong Engineering Investigation Institute,Guangzhou 510510,China;Guangdong Geological Environment Monitoring Station,Guangzhou 510510,China)
出处 《华南地震》 2019年第3期146-152,共7页 South China Journal of Seismology
基金 广东省国土资源厅科研专项(GDGTKJ2016004)
关键词 地质灾害治理 后评价 勘查 设计 施工 监理 Geological hazard management Post evaluation Exploration Design Construction Supervision
  • 相关文献

参考文献4

二级参考文献36

共引文献33

同被引文献17

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部