摘要
本文介绍了广蓄A厂水泵水轮发电机组主进水球阀与尾水事故闸门液压闭锁实现过程,功能试验过程及重要作用。
This paper introduces the realization process,functional test process and important role of hydraulic locking of main inlet spherical valve and Tailwater emergency gate of pump turbine-generator unit in Guangzhou Pumped Storage Power Station A.
出处
《电力系统装备》
2019年第15期152-153,共2页
Electric Power System Equipment
关键词
球阀
尾闸
液压闭锁
spherical valve
tailwater emergency gate
hydraulic blocking