本文针对浙能集团某600MW超临界火力发电厂冷却塔塔芯材料进行研究,通过方案比选提出了冷却塔改造的技术路线,并最终确认最佳方案。项目实施后通过性能测试,计算了改造的节能量和经济性。
According to the research on the core material of cooling tower in a 600 MW supercritical thermal power plant of Zhengneng Group,the technical route of cooling tower transformation is put forward through scheme comparison and selection,and the best scheme is finally confirmed.After the project is implemented,the energy saving and economy of the transformation are calculated through performance test.It provides an excellent reference for the transformation of cooling towers in power plants.
出处
《电力系统装备》
2019年第14期179-180,共2页
Electric Power System Equipment
关键词
冷却塔
填料
片距
出塔水温
节能
效率
cooling tower
packing
sheet spacing
outlet water temperature
energy saving