期刊文献+

浅谈如何做好综采工作面机电设备安装回撤工作 被引量:4

Discussion on How to Do Well in the Installation and Withdrawal Work of Mechanical and Electrical Equipment in Fully Mechanized Mining Face
下载PDF
导出
摘要 随着生产力和科学技术的进步发展,煤矿井下的工作面开采形式变得非常严峻,做好机电设备的安装回撤工作十分重要,这是制约矿井安全生产的关键要素。论文主要根据相关工作经验,总结并提出了较好的设备回撤方法。 With the development of productivity and science and technology,the mining form of coal mining face has become very severe.It is very important to do a good job in the installation and withdrawal of mechanical and electrical equipment,which is the key factor restricting the safety of mine production.The paper mainly summarizes and proposes a better device withdrawal method based on relevant work experience.
作者 马文波 MA Wen-bo(Qian Yingzi Coal Mine Installation Area,Wanbei Coal-electricity Group,Suzhou 234000,China)
出处 《中小企业管理与科技》 2019年第23期195-196,共2页 Management & Technology of SME
关键词 煤矿开采 综采工作面 机电设备 coal mining fully mechanized mining face mechanical and electrical equipment
  • 相关文献

参考文献2

二级参考文献6

共引文献13

同被引文献9

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部