万家寨水利枢纽5号机组尾水中墩冻融破坏修复处理 被引量:2

Repair of Freezing and Thawing Damage in Tail Water Pier of Unit 5 of Wanjiazhai Hydropower Station
下载PDF
导出
摘要 万家寨水利枢纽位于属温带大陆性季风气候的西北黄土高原区,冬季气温低、持续时间长,每年有4-5个月时间温度处于0℃以下,记录最低气温为-31℃。经多年运行,尾水闸墩水位变化区域混凝土出现不同程度冻融破坏,决定采用UWB水下不分散混凝土进行修复处理。 The Wanjiazhai hydropower station is located in the northwest Loess Plateau with a temperate conti nental mon soon climate. The winter temperature is low and the duration is long. The temperature is below 0℃ for 4-5 months and the minimum temperature is -31℃.After many years of operation, the concrete in the water level change area of tail water sluice pier has suffered d iff ere nt degrees of freeze-thaw damage, and it was decided to use UWB underwater non-dispersed concrete to repair it.
作者 侯争光 HOU Zhengguang(Y.R. Wanjiazhai Multiple-purpose Dam Project Co. Ltd., Pianguan 036412, China)
出处 《水电与抽水蓄能》 2019年第4期93-96,共4页 Hydropower and Pumped Storage
关键词 尾水中墩 冻融 水下不分散混凝土 tail underwater freeze-thaw underwater nondispersed concrete
  • 相关文献

参考文献5

二级参考文献4

共引文献29

同被引文献9

引证文献2

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部