现浇箱涵模板支撑架整体移动式施工技术 被引量:3

Overall Mobile Construction Technology of Cast-in-water Box Culvert Template Support Frame
下载PDF
导出
摘要 现浇箱涵类结构物普遍工期较长,目前普遍的施工方法需对支架反复安拆,费时费力。对现浇箱涵支架整体移动施工方法进行论述,同时介绍相应的施工要点及要求,为今后现浇箱涵模板支撑架及现浇综合管廊等类似结构物施工提供有效的参考。 Cast-in-time box culvert structure generally has a long duration, the current general construction methods need to repeatedly remove the bracket, time-consuming and laborious. Discuss the overall moving construction method of cast-in-place box culvert bracket, and introduce the corresponding construction essentials and requirements, which provides an effective reference for the construction of similar structures such as cast-in-place box culvert template support frame and cast-in-place integrated pipe gallery in the future.
作者 刘函廷 熊添祥 刘帮 朱粒 LIU Han-ting;XIONG Tian-xiang;LIU Bang;ZHU Li(Guizhou Investment and Construction Co., Ltd., Guiyang 550081, China)
出处 《黑龙江生态工程职业学院学报》 2019年第5期29-30,81,共3页 Journal of Heilongjiang Vocational Institute of Ecological Engineering
关键词 支架 整体移动 工期 成本 Support frame Overall mobile Construction period Cost
  • 相关文献

同被引文献9

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部