期刊文献+

建筑垃圾PPP项目风险系统稳定性分析 被引量:10

The Reliability Analysis of Risk System in Construction Waste PPP Projects
下载PDF
导出
摘要 建筑垃圾处理PPP模式是建筑垃圾资源化发展的主要趋势。PPP项目涉及的利益相关者众多,在全生命周期过程中面临的不确定因素较多。基于建筑垃圾PPP项目全生命视角,构建建筑垃圾处理PPP项目风险评价体系,以227份问卷调查数据分析为基础,利用应用管理熵理论和Brusselator模型,对建筑垃圾PPP项目风险系统稳定性耗散性能进行评价。研究结果表明,建筑垃圾PPP项目风险系统处于耗散结构状态。要防范PPP项目系统风险非耗散性,未来应从鼓励技术创新,加强灾害预防,提供政策扶持,加强项目管理等方面改进。 PPP mode of construction waste treatment is the main trend of development of construction waste recycling, which involves many stakeholders and faces many uncertainties throughout the full life cycle. Based on the whole life perspective, this paper established a risk evaluation system for construction waste PPP projects with questionnaire survey and data analysis. The reliability dissipation performance of risk system in construction waste PPP projects is analyzed by using management entropy theory and Busselator model. The results show that the risk system of PPP projects is a dissipative structure. It should improve the technology innovation, strengthen disaster prevention, provide policy support and improve project management in the future to prevent the non-dissipation of risks in PPP project systems.
作者 汪振双 李鑫 赵宁 WANG Zhen-shuang;LI Xin;ZHAO Ning(School of Investment and Construction Management, Dongbei University of Finance and Economics, Dalian 116025, China;PPP Research Center, Dongbei University of Finance and Economics, Dalian 116025, China;School of Finance, Dongbei University of Finance and Economics, Dalian 116025, China)
出处 《工程管理学报》 2019年第4期59-64,共6页 Journal of Engineering Management
基金 辽宁省财政厅项目(18C022) 辽宁省教育厅青年科技“育苗”项目(LN2019Q39) 2018年大岳高校毕业论文PPP引导计划
关键词 建筑垃圾 PPP项目 风险系统稳定性 系统熵 construction waste PPP projects stability of risk system system entropy
  • 相关文献

参考文献13

二级参考文献126

共引文献589

同被引文献77

引证文献10

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部