摘要 为了避免理砌块石护面发生跳脱、翻滚、位移等失稳现象,以及解决瓯飞围垦工程料源紧缺的现实问题,开展了波浪作用下迎潮面镇压层理砌块石、砼半灌块石护面结构稳定性的室内模型及现场对比试验。试验结果表明,砼半灌块石护面结构在满足工程设防标准的前提下,能够有效降低块石重量及护面厚度,提高料源的利用率及块石护面结构的抗风浪能力。 Armour rock structure often appears instability like escape,rolling,displacement.Oufei reclamation project had the problem of rock material shortage.The stability of different revetment structure under the action of wave were analyzed by laboratory test and field test.It shows that on the premise of satisfying defending standards of project,concrete half-grouting armour rock can effectively reduce rock weight and armour thickness,and improve the utilization of rock material and wave attenuation performance of armour structure.
作者 林波 臧振涛 李东风 高健 LIN Bo;ZANG Zhen-tao;LI Dong-feng;GAO Jian(Zhejiang University of Water Resources an dElectric Power,Hangzhou3 10018,China;Zhejiang University of Water Investigation,DesignR esearch InstituteCo.,Ltd.,Hangzhou 310018,China)
出处 《水电能源科学》 北大核心 2019年第9期96-99,共4页 Water Resources and Power
关键词 块石护面 稳定性 室内模型试验 现场试验 砼半灌 armour rock stability indoor model test field-test concrete half-grouting
  • 相关文献

参考文献1

二级参考文献2

共引文献5

同被引文献14

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部