某核电站屏蔽厂房双层钢板混凝土模板结构(简称SC结构)采用分层构造,模块安装就位因构造差异采用不同的吊装工艺,对2~7层非闭合区域模块吊装采用二级平衡梁整体吊装工艺中吊装体系及平衡梁构造进行设计和分析,实现了SC结构组合模块的顺利吊装。
The double-layer steel plate concrete formwork structure(SC structure) of a shielding plant of a nuclear power plant adopts layered structure,the bottom area is non-closed structure,and the middle and upper part is closed structure. Different hoisting technologies are adopted for the installation and placement of SC structure module due to the structural differences. The two-level balanced beam integral hoisting technology is adopted for the hoisting construction of the module in the non-closed area of floor2 ~ 7.Through the design and analysis of the two-level balanced beam hoisting system and the structure of the balanced beam,the SC structure module is successfully hoisted.
作者
马富巧
王建国
赵宇
蒋其孟
MA Fuqiao;WANG Jianguo;ZHAO Yu;JIANG Qimeng(China Nuclear Industry Huaxing Construction Co. , Ltd., Nanjing, Jiangsu 210019 , China)
出处
《施工技术》
CAS
2019年第16期85-88,共4页
Construction Technology
基金
国家科技重大专项:CAP1400核电站SC结构施工技术研究(2017ZX06002008)
关键词
混凝土
SC结构
组合模块
平衡梁
吊装
concrete
SC structure
module
balanced beam
installation