布罗德兰水电站引水隧洞不良地质段的综合治理技术 被引量:2

Comprehensive Treatment for Adverse Geological Section of Diversion Tunnel of Broadland Hydropower Station
下载PDF
导出
摘要 布罗德兰水电站引水隧洞穿过岩溶区、区域大断层带等不良地质段遭遇到突水突泥、隧洞坍塌、洞身及临时支护失稳沉降等复杂问题,采取超前固结灌浆、管棚、注浆小导管、钢拱架、挂网锚喷等综合支护治理技术,确保了工程安全和施工顺利进行。通过对开挖支护及缺陷治理过程中的经验、问题分析,可为类似工程提供借鉴。 The diversion tunnel of Broadland Hydropower Station encountered complicated problems such as water and mud gushing, tunnel collapse, tunnel body and temporary support instability settlement while passing through geological sections of karst area and large fault zone. Safety and construction of this Project are ensured through comprehensive support and treatment technologies as advanced consolidation grouting, pipe shed, small grouting pipe, steel arch frame, and hanging net anchor spray. Through analysis on experience and problems in the process of excavation, support and defect management, it can provide reference for similar projects.
作者 盛晓波 SHENG Xiaobo(Hunan Hydro & Power Design Institute, Changsha 41007, China)
出处 《广东水利水电》 2019年第9期16-21,共6页 Guangdong Water Resources and Hydropower
关键词 水电站 引水隧洞 涌水突泥 岩溶坍塌 加固治理 hydropower station diversion tunnel water and mud gushing karst collapse reinforcement treatment
  • 相关文献

参考文献5

二级参考文献18

共引文献54

同被引文献13

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部