摘要
以武深高速金水枢纽互通工程跨京港澳高速公路为例,基于其施工组织安排,对跨线施工的交通施工组织安排和安全设施标志问题提出一些建议,以保障跨线工程施工过程的顺利进行。
Based on the example of the Wu-Shen Expressway Jinshui Junction interchange project crossing Beijing-Hongkong-Macao Expressway and the construction organization and arrangement, some suggestions are put forward on the traffic construction organization and arrangement and safety facility sign of the cross-line construction, so as to ensure the smooth construction process of the cross-line project.
作者
李士林
刘梦
曹佐鹏
LI Shi-lin;LIU Meng;CAO Zuo-peng(The Third Engineering Co.Ltd.of CCCC Third Highway Engineering Bureau,Wuhan 430000,China)
出处
《工程建设与设计》
2019年第17期274-275,281,共3页
Construction & Design for Engineering
关键词
跨线施工
交通组织
应急预案
crossing line construction
traffic organization
emergency response plan