摘要 为找到一种更加适合单洞双向行车特长公路隧道的通风方案,解决此类隧道排烟困难、人员疏散逃生困难的问题,结合具体工程,针对扎尕梁特长公路隧道的特点,提出合流型通风井排出式+射流风机纵向通风、平导压入式网络通风以及射流风机纵向通风+斜井分段排烟3种通风方案,从土建费用、机电设备初期投资、运营电费、通风控制、通风网络稳定性、通风方案的适用性以及管理维护几个方面对各个通风方案进行比选,通过比较各个方案的优点和缺点,最终给出推荐方案:射流风机纵向通风+斜井分段排烟方案。隧道正常运营工况下,主洞采用全射流纵向通风,实现按需通风;火灾工况下利用排烟斜井进行排烟,解决平导排烟只能分2段排烟的问题;利用平行导洞进行人员的疏散逃生和救援,解决人员疏散逃生问题。 In order to select a suitable ventilation scheme for a single-tube extra-long highway tunnel with two-way traffic, as well as to solve problems in smoke exhaust and personnel evacuation in such tunnel, 3 ventilation schemes are proposed. According to the characteristics of Zhagaliang extra-long highway tunnel, the 3 ventilation schemes include confluent ventilation with exhaust shaft and longitudinal ventilation with jet fans, parallel pilot tunnel forced ventilation network, and longitudinal ventilation with jet fans and sectional smoke exhaust by inclined shaft. The ventilation schemes are compared from several aspects, i. e. civil construction cost, initial investment of mechanical and electrical equipment, electricity cost during tunnel operation, ventilation control, stability of ventilation network, applicability, management and maintenance. Finally, the most suitable ventilation scheme is selected by comparing the advantages and disadvantages of each scheme, i. e. longitudinal ventilation with jet fans and sectional smoke exhaust by inclined shaft. Under the normal operation condition of the tunnel, longitudinal ventilation with jet fans is adopted in the main tunnel, and on-demand ventilation can be realized. Smoke can be exhausted by inclined shaft in case of fire, which can solve the problem of smoke exhaust only in two sections by the parallel pilot tunnel. The parallel pilot tunnel can also be used for personnel evacuation and rescue.
作者 李志鹏 LI Zhipeng(Shanxi Transportation Research Institute,Taiyuan 030006,Shanxi,China)
出处 《隧道建设(中英文)》 北大核心 2019年第9期1486-1493,I0003-I0010,共16页 Tunnel Construction
关键词 公路隧道 单洞双向行车 隧道通风 分段排烟 highway tunnel single-tube two-way traffic tunnel ventilation sectional smoke exhaust
  • 相关文献

参考文献8

二级参考文献46

  • 1曾艳华,李永林,何川.鹧鸪山隧道防灾救援通风研究[J].现代隧道技术,2004,41(4):55-58. 被引量:7
  • 2卢平,丛北华,廖光煊,范维澄,厉培德.纵向通风水平隧道火灾烟气流动特性研究[J].中国工程科学,2004,6(10):59-64. 被引量:35
  • 3张发勇,冯炼.终南山特长公路隧道火灾通风数值模拟分析[J].地下空间,2004,24(4):506-509. 被引量:10
  • 4徐瑞龙.通风网络理论[M].北京:煤炭工业出版社,1993..
  • 5[1]中华人民共和国交通部.JTJ 026.1-1999公路隧道通风照明设计规范[S].北京:人民交通出版社,2000.
  • 6[2]长安大学课题组.长大公路隧道通风仿真模拟试验技术的研究[R].西安:长安大学,2003.
  • 7[6]M.J.Mcpherson.Subsurface Ventilation and EnvironmentalEngineering[J].London:Chapman & Hall,1993.
  • 8[3]马壮林.高速公路隧道交通事故分析及预防对策[M].西安:长安大学出版社,2006.
  • 9JTJ026.1—1999.公路隧道通风照明设计规范[S].[S].,..
  • 10JTJ026.1-1999.公路隧道通风照明设计规范[S].[S].,..

共引文献88

同被引文献54

引证文献8

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部