向家坝水电站高重力坝入仓交通规划设计与应用

Warehouse Entry Traffic Planning Design and Application of High Gravity Dam in Xiangjiaba Hydropower Station
下载PDF
导出
摘要 向家坝水电站二期工程Ⅰ标段工期紧、任务重。为保证"二期基坑进水"这一控制性工程按工期要求顺利完成,施工单位遵循"安全第一、有利生产、合理配置"的原则,对本标段入仓交通进行统筹规划与设计,并在现场布置实施,满足了人员安全通行及小件物资运输的需要,为工程按期蓄水发电创造了有利条件。 Bid Section I of Xiangjiaba Hydropower Station Phase II Project has tight construction period and heavy tasks.In order to ensure the smooth completion of the controlling construction period of" the second stage of foundation pit water intake",the construction unit follows the principle of" safety priority,favorable production and reasonable allocation" to make overall planning for the warehousing entry traffic of the tender section,and arranges and implements it on the spot,which meets the needs of safe passage of personnel and transportation of small items of materials,and creates favorable conditions for impounding of the water and power generation of the project on time.
作者 马斌 Ma Bin(China Gezhouba Group Three Gorges Construction Engineering Co.,Ltd.,Yichang Hubei 443002,China)
出处 《城市建筑》 2019年第18期105-107,共3页 Urbanism and Architecture
关键词 向家坝水电站 入仓 交通规划 设计 高程 转梯 Xiangjiaba hydropower station warehouse entry traffic plan design elevation stairway
  • 相关文献

参考文献4

二级参考文献3

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部