摘要
向家坝水电站二期工程Ⅰ标段工期紧、任务重。为保证"二期基坑进水"这一控制性工程按工期要求顺利完成,施工单位遵循"安全第一、有利生产、合理配置"的原则,对本标段入仓交通进行统筹规划与设计,并在现场布置实施,满足了人员安全通行及小件物资运输的需要,为工程按期蓄水发电创造了有利条件。
Bid Section I of Xiangjiaba Hydropower Station Phase II Project has tight construction period and heavy tasks.In order to ensure the smooth completion of the controlling construction period of" the second stage of foundation pit water intake",the construction unit follows the principle of" safety priority,favorable production and reasonable allocation" to make overall planning for the warehousing entry traffic of the tender section,and arranges and implements it on the spot,which meets the needs of safe passage of personnel and transportation of small items of materials,and creates favorable conditions for impounding of the water and power generation of the project on time.
作者
马斌
Ma Bin(China Gezhouba Group Three Gorges Construction Engineering Co.,Ltd.,Yichang Hubei 443002,China)
出处
《城市建筑》
2019年第18期105-107,共3页
Urbanism and Architecture
关键词
向家坝水电站
入仓
交通规划
设计
高程
转梯
Xiangjiaba hydropower station
warehouse entry
traffic plan
design
elevation
stairway