期刊文献+

矮塔斜拉桥施工监控要点探讨 被引量:4

Discussion on Main Construction Monitoring Points of Extradosed Cable-stayed Bridge
下载PDF
导出
摘要 文章以某矮塔斜拉桥为项目依托,从控制点复核、主梁线形测量、应力测量、桥塔偏位测量、24 h 监测等方面,探讨矮塔斜拉桥施工监控关键技术要点,为类似桥梁工程施工监控提供参考。 With an extradosed cable-stayed bridge as the project support,this article discusses the key technical points of extradosed cable-stayed bridge construction monitoring from the aspects such as control point review,main beam linear measurement,stress measurement,bridge tower deviation measurement and24-hour monitoring,thus providing the reference for similar bridge construction monitoring.
作者 谢军 王龙林 于孟生 XIE Jun;WANG Long-lin;YU Meng-sheng(Guangxi Transportation Research & Consulting Co.,Ltd.,Nanning,Guangxi,530007)
出处 《西部交通科技》 2019年第6期70-74,共5页 Western China Communications Science & Technology
关键词 施工监控 斜拉桥 线形测量 应力测量 桥塔偏位 Construction monitoring Cable-stayed bridge Linear measurement Stress measurement Tower displacement
  • 相关文献

参考文献8

二级参考文献16

共引文献98

同被引文献28

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部