基于BIM-RFID的装配式建筑实施进度风险管理 被引量:6

Implementation Schedule Risk Management for Prefabricated Building Based on BIM-RFID
下载PDF
导出
摘要 将装配式建筑实施过程划分为构件生产、运输存储、现场装配以及运营维修四个阶段,通过分析实施进度风险管理的特点,基于熵权法确定了每个阶段的关键进度风险因素。建立BIM-RFID的进度风险管理体系,为控制各阶段关键风险因素提供信息化的管理手段。BIM-RFID体系体现了动态管理、数据获取自动化、进度可视化的特点,为推动建筑产业现代化提供思路。 The implementation process of prefabricated building is divided into four stages:component production,transportation and storage,on-site assembly and operation and maintenance.By analyzing the characteristics of schedule risk management,the key factors of each stage are determined based on entropy weight method.The schedule risk management system of BIM-RFID is built to provide information-based management means for controlling those key risk factors in each stage.The characteristics of dynamic management,data acquisition automation and progress visualization are embodied inthe BIM-RFID system,which provides ideas for promoting the modernization of the construction industry.
作者 李辉山 王冉 LI Hui-shan;WANG Ran(School of Civil Engineering,Lanzhou University of Technology,Lanzhou 730050,China)
出处 《建筑节能》 CAS 2019年第9期148-153,共6页 BUILDING ENERGY EFFICIENCY
关键词 装配式建筑 进度风险管理 熵权法 BIM RFID prefabricated building schedule risk management entropy weight method BIM RFID
  • 相关文献

参考文献10

二级参考文献73

共引文献792

同被引文献31

引证文献6

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部