摘要
水电站经过几十年的运行,机组设备机型老化,效率低下,装机容量偏小,急需更新改造。通过对发电水头的确认,选择综合能量性能指标高的转轮,达到增容目的。
After decades of operation, the equipment of the hydropower station is aging, the efficiency is low, the installed capacity is small, and there is an urgent need for renovation. Through the confirmation of the power generation head, the runner with high comprehensive energy performance index is selected, so as to achieve the purpose of increasing capacity.
出处
《科技创新与应用》
2019年第30期147-148,共2页
Technology Innovation and Application
关键词
水电站
增容改造
发电水头
hydropower station
capacity increase and transformation
power generation head