鞍钢7 m顶装焦炉斗嘴控制系统改进与优化

Improvement and Optimization of Control System for Funnel Mouth in 7 m Top-charged Coke Oven in Ansteel
下载PDF
导出
摘要 介绍了鞍钢股份有限公司炼焦总厂7m顶装煤焦炉斗嘴控制系统的概况。针对该系统在生产运行中存在的问题,提出了增加控制联锁点、利用信号电道、增加斗嘴监控及增设紧急操作箱等改进与优化措施。应用后,煤塔因电气回路及元器件故障所引起的淌煤事故率降低为零,增强了顶装煤焦炉煤塔和装煤车等设备在运行过程中的安全稳定性。 The general situation on the control system for the funnel mouth in the 7 m top-charged coke oven in General Coking Plant of Angang Steel Co., Ltd. was introduced. In allusion to the troubles occurred in the system in operation, these improvement and optimization measures such as installing the control interlock points, taking advantage of the signal circuit, installing the monitoring device for the funnel mouth and the emergency control box were proposed. After the measures were taken, the failure rate of coal flowing down from the coal bunker due to the troubles occurred in electric circuit and electronic devices was reduced to zero percent, and thus both safety and stability of the equipment such as coal bunker and charging car were improved.
作者 赵锋 王瀚萱 刘振猛 肖立 甘秀石 Zhao Feng;Wang Hanxuan;Liu Zhenmeng;Xiao Li;Gan Xiushi(General Coking Plant of Angang Steel Co.,Ltd.,Anshan 114021,Liaoning,China)
出处 《鞍钢技术》 CAS 2019年第5期35-38,共4页 Angang Technology
关键词 顶装焦炉 装煤车 煤塔斗嘴 淌煤 PLC控制 top-charged coal oven charging car funnel mouth of coal bunker coal flowing down from coal bunker PLC control
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部