摘要
采用TOWER、SAP2000和ANSYS等软件对悬索拉线塔的拉线布置、拉线预张力、主柱初始缺陷、主柱长细比进行了优化分析,并给出了设计建议。
This paper makes the optimized analysis of the guy wire arrangement, pretension of guy wire, initial defect of main mast and slenderness ratio of main mast of the suspension cable guyed tower using TOWER, SAP2000 and ANSYS softwares, and gives some design suggestions.
作者
杨宗奇
贾晓亚
张斌
YANG Zongqi;JIA Xiaoya;ZHANG Bin(POWERCHINA Henan Electric Power Survey & Design Institute Co. , Ltd. , Zhengzhou 450007, China;Henan Zhonghui Power Engineering Consultants Co. , Ltd. , Zhengzhou 450007, China)
出处
《电工技术》
2019年第17期55-57,共3页
Electric Engineering
关键词
悬索拉线塔
拉线
悬索
主柱
初始缺陷
suspension cable guyed tower
guy wire
suspension cable
main mast
initial defect