期刊文献+

已建光伏的大工业用户储能配置方案研究

Research on Energy Storage Configuration for Great Industry Users with Built PV System
下载PDF
导出
摘要 从部分大工业用户配置有一定容量的分布式光伏发电系统现状入手,结合福建省大工业用户峰谷分时电价政策,着重对此类用户配置电化学储能系统后的光伏消纳率及经济效益进行研究,并结合工程实际案例,得出配置分布式光伏发电系统的大工业用户电化学储能容量配置的方案原则,以供设计人员参考。 Under the current situation that some great industry users have a certain scale PV system, and considering the industrial time-of-use price policy, photovoltaic absorption rate and economic benefit of electrochemical energy storage system were studied for such users. Based on practical engineering cases, battery configuration principle of great industry users with built PV System was proposed, which gave a reference for designer.
作者 林伟 林心昊 LIN Wei;LIN Xinhao(Power China Fujian Electric Power Survey & Design Institute Co. , Ltd. , Fuzhou 350003, China)
出处 《电工技术》 2019年第17期97-99,共3页 Electric Engineering
关键词 储能配置 大工业用户 峰谷分时 energy storage configuration great industry users time-of-use price
  • 相关文献

参考文献1

二级参考文献9

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部