期刊文献+

基于系统有效度的预防性维修工作优化 被引量:1

Optimization of Preventive Maintenance Based on System Availability
下载PDF
导出
摘要 核电厂在商运初期开展预防性维修工作时会遇到无法顺利开展的问题,通过分析问题成因,采用分解递进的工作方式,从工作项目、周期、零点、窗口和替代关系等方面,对预防性工作进行优化,同时将隔离边界和IO判定等信息固化进数据库中,为后期工作计划的安排提供了依据,提高了系统设备的有效可用度,降低了维修活动管理成本。根据此次工作经验,提出从监测设备状态、建立设备功能组和识别RTF设备三方面出发,持续对预防性维修工作进行优化的建议。 There were some common problems when doing preventive maintenance in nuclear power plant at the beginning of commercial operation. The paper analyzed the cause of the problems and established work breakdown structure. Theoptimization of preventive maintenance was implemented through the aspects of work items, maintenance cycles, zeros, windows and substitutions. The information such as isolation boundary and IO determination were recorded into the database of PM, which provided a basis for the arrangement of the later work plan,improved the effective availability of the system equipment and reduced the cost of maintenance. Based on this experience,suggetstions for the continous optimization of PM were proposed from the three aspects of monitoring the equipment status、setting up equipment functional groups and identifying RTF equipment.
作者 金童 隋学文 JIN Tong;SUI Xuewen(Hainan Nuclear Power Co. , Ltd. , Changjiang 572733, China)
出处 《电工技术》 2019年第17期115-117,119,共4页 Electric Engineering
关键词 核电厂 预防性维修优化 系统有效度 nuclear power plant preventive maintenance optimization availability of system
  • 相关文献

参考文献2

二级参考文献24

  • 1蔡景,左洪福,刘明,耿端阳.复杂系统成组维修策略优化模型研究[J].应用科学学报,2006,24(5):533-537. 被引量:34
  • 2司文杰,郑映烽,蔡琦.预防性维修最佳维修周期决策[J].船海工程,2006,35(5):99-101. 被引量:6
  • 3蔡景,左洪福,王华伟.基于经济相关性的复杂系统维修优化模型研究[J].系统工程与电子技术,2007,29(5):835-838. 被引量:18
  • 4王世平 朱敏波.电子机械可靠性与维修性[M].北京:清华大学出版社,2000.4.
  • 5薛定字,陈阳泉.高等应用数学问题的MATLAB求解[M].北京:清华大学出版社,2004.
  • 6JIN Y L, JIANG Z H, HOU W 1L Multi-objective integrated optimization research on preventive maintenance planning and production Scheduling for a single machine [J]. Int J Adv Manuf Technol, 2008,39: 954-964.
  • 7ZUBILLAGAA AO,GOTI A,SANCHEZ A. Preventive main- tenance optimization of multi-equipment manufacturing sys- tems by combining discrete event simulation and multi-objective evolutionary algorithms [J]. Production Planning ~ Con- trol, 2008,19 (4) : 342-355.
  • 8Dekker R, vander D F, Wildeman R. A review of multi component maintenance models with economic dependence[J]. Mathematical Methods of Operations Research, 1996,45:411-435.
  • 9Mobley R K. An introduction to predictive maintenance [M]. New York: Elsevier science, 2002:10-12.
  • 10Budai G, Huisman D, Dekker R. Scheduling preventive railway maintenance activities [J]. Journal of the Operational Research Society, 2006,57 : 1035-1044.

共引文献18

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部