摘要
依据引江济淮工程输水沿线菜子湖、巢湖、瓦埠湖及蚌埠闸上等主要调蓄区现状水位资料,基于各调蓄区各级水行政主管部门批复的调度运用办法及引江济淮工程规划水平年2030年、2040年输水过程,分析了工程建设前后菜子湖、巢湖、瓦埠湖及蚌埠闸上等调蓄区水位变化情况.
Based on the current water level data of Caizi Lake, Chaohu Lake, Wabu Lake and Bengbu Gate along the Yangtze River-to-Huaihe River Water Transfer Project, the water level of these before and after the construction of the project is analyzed based on the dispatching operation methods approved by the water administrative departments at all levels of the diversion and storage areas and the water conveyance process in 2030 and 2040 years of the planning level of the diversion project from the Yangtze to the Huaihe River.
作者
邢凯
XING Kai(Chaohu-Floodgate Management Office of Chaohu Authority,Chaohu 238000,Anhui,China)
出处
《安徽水利水电职业技术学院学报》
2019年第3期14-17,共4页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
湖泊调蓄
水文情势
水位变化
引江济淮
flood adjustment and reservation
hydrological regime
change of water level
Yangtze River-to-Huaihe River Water Transfer Project